HOTEL ****CLUJ


HOTEL **** Calea Turzii nr. 43-49 – Cluj-Napoca (2006-2009) etapa I 



DATE TEHNICE 

 

Sc= 830,08 mp

Sd= 5853,92 mp

Su= 4989.00 mp

 

ECHIPA

 

PROIECTANT GENERAL :S.C. BAU S.R. L. - arh. Adrian Borda (autor)

 

PROIECTANT SPECIALITATE ARHITECTURA : S.C. COCHECI BIROU DE ARHITECTURA S.R.L.

                  - arh. Radu Cocheci (coautor/sef proiect etapa I)

                  - arh. Adriana Cocheci

 

REZISTENȚA : S.C. PROVEREX IMPEX S.R.L.

                   - ing. Ștefan Pintea

 

 

INSTALAȚII TERMICE / SANITARE / GAZ / ELECTRICE VENTILATII :  S.C. PROGIR S.R.L.

                   - ing. Radu Indolean

                   - ing. Radu Cristea       

                   - ing. Magyarosi Tibor

 

CONSTRUCTORI :

- S.C. PRECON S.R.L.

- S.C. EDINCO S.A.

- S.C. TERMOPLAST S.R.L.